Skip to content
Projects
Groups
Snippets
Help
Loading...
Help
Support
Keyboard shortcuts
?
Submit feedback
Contribute to GitLab
Sign in / Register
Toggle navigation
O
OpenXG UE
Project overview
Project overview
Details
Activity
Releases
Repository
Repository
Files
Commits
Branches
Tags
Contributors
Graph
Compare
Issues
0
Issues
0
List
Boards
Labels
Milestones
Merge Requests
0
Merge Requests
0
CI / CD
CI / CD
Pipelines
Jobs
Schedules
Analytics
Analytics
CI / CD
Repository
Value Stream
Wiki
Wiki
Snippets
Snippets
Members
Members
Collapse sidebar
Close sidebar
Activity
Graph
Create a new issue
Jobs
Commits
Issue Boards
Open sidebar
Michael Black
OpenXG UE
Commits
5f67059d
Commit
5f67059d
authored
Jun 29, 2020
by
Remi Hardy
Browse files
Options
Browse Files
Download
Email Patches
Plain Diff
Update TESTING_GNB_W_COTS_UE.md
parent
d3173c8d
Changes
1
Hide whitespace changes
Inline
Side-by-side
Showing
1 changed file
with
97 additions
and
9 deletions
+97
-9
doc/TESTING_GNB_W_COTS_UE.md
doc/TESTING_GNB_W_COTS_UE.md
+97
-9
No files found.
doc/TESTING_GNB_W_COTS_UE.md
View file @
5f67059d
...
...
@@ -238,19 +238,107 @@ The test reaches step **12. E-RAB modifcation confirmation** , eventhough not al
From the log file that is generated, we can monitor several important steps, to assess that the test was successful:
Step
**6. Random Access Procedure**
is successfully reached when the following messages are shown:
[X2AP ... Received elements for X2P]
...
[LSCH received ok]
The next message to check is:
[DCI type I payload] indicating some DL traffic for signaling
-
eNB receives UE capabilities information, including its NR capabilites, and triggers sGNB Addition Request message:
Eventually, step
**12. E-RAB Modification Confirmation**
is successfully reached when the following message is visible:
[E-RAB Modification Confirmation], the message is properly received but not treated.
***eNBlog.1315 :**
*
```
[RRC] [FRAME 00000][eNB][MOD 00][RNTI 43eb] received ueCapabilityInformation on UL-DCCH 1 from UE
...
[RRC] [eNB 0] frame 0 subframe 0: UE rnti 43eb switching to NSA mode
...
<X2AP-PDU>
<initiatingMessage>
<procedureCode>27</procedureCode>
<criticality><reject/></criticality>
<value>
<SgNBAdditionRequest>
<protocolIEs>
<SgNBAdditionRequest-IEs>
<id>111</id>
<criticality><reject/></criticality>
<value>
<UE-X2AP-ID>0</UE-X2AP-ID>
</value>
</SgNBAdditionRequest-IEs>
```
-
gNB receives sGNB Addition request, processes UE capabilities for the corresponding UE and triggers sGNB Addition Request ACK, carrying NR RRC Reconfiguration message:
***gNBlog.2291 :**
*
```
<X2AP-PDU>
<successfulOutcome>
<procedureCode>27</procedureCode>
<criticality><reject/></criticality>
<value>
<SgNBAdditionRequestAcknowledge>
<protocolIEs>
<SgNBAdditionRequestAcknowledge-IEs>
<id>111</id>
<criticality><reject/></criticality>
<value>
<UE-X2AP-ID>0</UE-X2AP-ID>
</value>
</SgNBAdditionRequestAcknowledge-IEs>
```
-
Upon reception of the sGNB Addition Request ACK, the eNB sends a new RRCConnectionReconfiguration message containing the NR Reconfiguration.
The UE replies with a Reconfiguration Complete message:
***eNBlog.1686 :**
*
```
[RRC] [FRAME 00000][eNB][MOD 00][RNTI 43eb] UE State = RRC_RECONFIGURED (default DRB, xid 1)
```
-
The Random Access procedure of the UE to the gNB takes place:
***gNBlog.2382 :**
*
```
[PHY] [gNB 0][RAPROC] Frame 751, slot 19 Initiating RA procedure with
preamble 63, energy 35.7 dB, delay 6
[0m [0m[MAC] [gNB 0][RAPROC] CC_id 0 Frame 751, Slot 19 Initiating RA
procedure for preamble index 63
[0m [0m[MAC] [gNB 0][RAPROC] CC_id 0 Frame 751 Activating Msg2
generation in frame 752, slot 7 using RA rnti 10b
[0m [0m[MAC] [gNB 0] [RAPROC] CC_id 0 Frame 752, slotP 7: Generating
RAR DCI, state 1
[0m [0m[MAC] [RAPROC] DCI type 1 payload: freq_alloc 120 (0,6,24),
time_alloc 3, vrb to prb 0, mcs 0 tb_scaling 0
[0m [0m[MAC] Frame 752: Subframe 7 : Adding common DL DCI for RA_RNTI 10b
[0m [0m[MAC] Frame 752, Subframe 7: Setting Msg3 reception for Frame
752 Subframe 17
[0m [0m[PHY] ULSCH received ok
```
-
The eNB triggers the path switch procedure towards the MME, so that
the traffic can be routed now from the SGW towards the gNB on the S1-U
plane.
***eNBlog.1691 :**
*
```
<S1AP-PDU>
<initiatingMessage>
<procedureCode>50</procedureCode>
<criticality><reject/></criticality>
<value>
<E-RABModificationIndication>
<protocolIEs>
<E-RABModificationIndicationIEs>
<id>0</id>
<criticality><reject/></criticality>
<value>
<MME-UE-S1AP-ID>553648130</MME-UE-S1AP-ID>
</value>
</E-RABModificationIndicationIEs>
```
Eventually, step
**12. E-RAB Modification Confirmation**
is successfully reached
TO DO : attach typical succcessful log file as example, add snaps of msg
## Required tools for debug
...
...
Write
Preview
Markdown
is supported
0%
Try again
or
attach a new file
Attach a file
Cancel
You are about to add
0
people
to the discussion. Proceed with caution.
Finish editing this message first!
Cancel
Please
register
or
sign in
to comment