Skip to content
Projects
Groups
Snippets
Help
Loading...
Help
Support
Keyboard shortcuts
?
Submit feedback
Contribute to GitLab
Sign in / Register
Toggle navigation
O
OpenXG UE
Project overview
Project overview
Details
Activity
Releases
Repository
Repository
Files
Commits
Branches
Tags
Contributors
Graph
Compare
Issues
0
Issues
0
List
Boards
Labels
Milestones
Merge Requests
0
Merge Requests
0
CI / CD
CI / CD
Pipelines
Jobs
Schedules
Analytics
Analytics
CI / CD
Repository
Value Stream
Wiki
Wiki
Snippets
Snippets
Members
Members
Collapse sidebar
Close sidebar
Activity
Graph
Create a new issue
Jobs
Commits
Issue Boards
Open sidebar
Michael Black
OpenXG UE
Commits
8bf8588e
Commit
8bf8588e
authored
Jun 23, 2020
by
Remi Hardy
Browse files
Options
Browse Files
Download
Email Patches
Plain Diff
Update TESTING_GNB_W_COTS_UE.md
parent
b302a421
Changes
1
Show whitespace changes
Inline
Side-by-side
Showing
1 changed file
with
13 additions
and
21 deletions
+13
-21
doc/TESTING_GNB_W_COTS_UE.md
doc/TESTING_GNB_W_COTS_UE.md
+13
-21
No files found.
doc/TESTING_GNB_W_COTS_UE.md
View file @
8bf8588e
...
...
@@ -5,7 +5,7 @@
*
Commercial UE: Oppo Reno 5G
*
OAI Software Defined gNB and eNB
*
eNB RF front end: USRP (ETTUS) B200 Mini or B210
*
gNB RF front end: USRP (ETTUS) B200 Mini or B210 (N3
0
0 will be needed for MIMO and wider BW's)
*
gNB RF front end: USRP (ETTUS) B200 Mini or B210 (N3
1
0 will be needed for MIMO and wider BW's)
*
5G TDD duplexing mode
*
5G FR1 Band n78 (3.5 GHz)
*
BW: 40MHz
...
...
@@ -17,7 +17,7 @@ https://gitlab.eurecom.fr/oai/openairinterface5g/tree/develop
## Architecture Setup
photos and schemes
The scheme below depicts our typical setup:
![
image info
](
./testing_gnb_w_cots_ue_resources/oai_fr1_setup.jpg
)
...
...
@@ -32,32 +32,27 @@ See https://gitlab.eurecom.fr/oai/openairinterface5g/blob/develop/doc/BUILD.md#b
for reference:
https://github.com/OPENAIRINTERFACE/openair-epc-fed/blob/master-documentation/docs/DEPLOY_HOME.md
```
sudo bash
cd /opt/hss_sim0609
./starthss_real
sudo
```
-
**eNB**
```
sudo bash
cd /opt/hss_sim0609
./starthss_real
sudo
```
-
**gNB**
```
sudo bash
cd /opt/hss_sim0609
./starthss_real
sudo
```
## Conf Files
where are the
y
usage
where are the
config files located
how to use them
## Run / Test
...
...
@@ -65,9 +60,7 @@ usage
-
**EPC**
(on EPC host):
```
sudo bash
cd /opt/hss_sim0609
./starthss_real
sudo
```
Open another window and:
...
...
@@ -75,8 +68,7 @@ Open another window and:
```
sudo bash
cd /opt/ltebox/tools
./stop_ltebox
./start_ltebox
```
Note: when terminated the testing session, you shall stop the EPC by "./stop_ltebox"
...
...
@@ -99,15 +91,15 @@ Note: gNB is using branch NR_RRC_PRACH_procedures patched with gnb.diff
## Test Case
Test case description
Test case description
: UE attachement
## Expected Logs to check
what
and where to check
what
logs and where to check, to ensure that your setup works fine
## Required traces for debug
What info/traces/logs are needed for us to support the debug
## Status of the interoperability
-
setup of the CP in 4G
...
...
Write
Preview
Markdown
is supported
0%
Try again
or
attach a new file
Attach a file
Cancel
You are about to add
0
people
to the discussion. Proceed with caution.
Finish editing this message first!
Cancel
Please
register
or
sign in
to comment