- 21 Jul, 2016 5 commits
-
-
Cedric Roux authored
-
Cedric Roux authored
use mac_rlc_status_ind instead (at first I thought I could not use it and wrote mac_rlc_get_buffer_occupancy instead)
-
Cedric Roux authored
Merge branch 'feature-31-ff-scheduler-api' of https://gitlab.eurecom.fr/oai/openairinterface5g into feature-31-ff-scheduler-api
-
Cedric Roux authored
This was causing oaisim to fail way too often at the startup of a connection. Things should go better with this patch. It may not be the end of the story, the use of retrans_num_bytes_to_retransmit is not clear to me. The problem I see is: what if the max number of retransimission has been reached (if that has a meaning at all in RLC AM)? will this value be decreased or not?
-
Cedric Roux authored
-
- 12 Jul, 2016 1 commit
-
-
Florian Kaltenberger authored
-
- 05 Jul, 2016 2 commits
-
-
Cedric Roux authored
-
Cedric Roux authored
not sure about c-rnti
-
- 04 Jul, 2016 1 commit
-
-
Cedric Roux authored
-
- 31 May, 2016 4 commits
-
-
Florian Kaltenberger authored
-
Florian Kaltenberger authored
Merge branch 'feature-31-ff-scheduler-api' of https://gitlab.eurecom.fr/oai/openairinterface5g into feature-31-ff-scheduler-api
-
Cedric Roux authored
From IS-wireless, plus modifications to the code. Note that MAX_NUM_CCs is forced to 2 in the ff-* files.
-
Florian Kaltenberger authored
Merge branch 'feature-31-ff-scheduler-api' of https://gitlab.eurecom.fr/oai/openairinterface5g into feature-31-ff-scheduler-api
-
- 26 May, 2016 2 commits
-
-
Cedric Roux authored
there is surely a bug that triggers that behavior
-
Cedric Roux authored
This reverts commit d453a03a. For whatever reason the simulation does not work anymore, I have to revert this commit for things to work again...
-
- 15 May, 2016 1 commit
-
-
Florian Kaltenberger authored
Merge branch 'feature-31-ff-scheduler-api' of https://gitlab.eurecom.fr/oai/openairinterface5g into feature-31-ff-scheduler-api
-
- 29 Apr, 2016 3 commits
-
-
Cedric Roux authored
where it should have been frame*16+subframe)
-
Cedric Roux authored
-
Cedric Roux authored
-
- 25 Apr, 2016 1 commit
-
-
Cedric Roux authored
-
- 22 Apr, 2016 3 commits
-
-
Cedric Roux authored
-
Cedric Roux authored
-
Cedric Roux authored
-
- 21 Apr, 2016 8 commits
-
-
Florian Kaltenberger authored
Merge branch 'feature-31-ff-scheduler-api' of https://gitlab.eurecom.fr/oai/openairinterface5g into feature-31-ff-scheduler-api
-
Cedric Roux authored
-
Cedric Roux authored
-
Cedric Roux authored
-
Cedric Roux authored
does not handle TPC, plus the FAPI specification is not clear about TPC, so let's handle that part in openair.
-
Cedric Roux authored
-
Cedric Roux authored
-
Cedric Roux authored
-
- 20 Apr, 2016 2 commits
-
-
Florian Kaltenberger authored
-
Cedric Roux authored
-
- 19 Apr, 2016 2 commits
-
-
Cedric Roux authored
-
Cedric Roux authored
-
- 13 Apr, 2016 4 commits
-
-
Cedric Roux authored
Merge branch 'feature-31-ff-scheduler-api' of https://gitlab.eurecom.fr/oai/openairinterface5g into feature-31-ff-scheduler-api Conflicts: openair2/LAYER2/MAC/ff-mac.h
-
Cedric Roux authored
-
Florian Kaltenberger authored
-
Florian Kaltenberger authored
-
- 08 Apr, 2016 1 commit
-
-
Cedric Roux authored
-