Skip to content
Projects
Groups
Snippets
Help
Loading...
Help
Support
Keyboard shortcuts
?
Submit feedback
Contribute to GitLab
Sign in / Register
Toggle navigation
O
OpenXG-RAN
Project overview
Project overview
Details
Activity
Releases
Repository
Repository
Files
Commits
Branches
Tags
Contributors
Graph
Compare
Issues
0
Issues
0
List
Boards
Labels
Milestones
Merge Requests
0
Merge Requests
0
CI / CD
CI / CD
Pipelines
Jobs
Schedules
Analytics
Analytics
CI / CD
Repository
Value Stream
Wiki
Wiki
Snippets
Snippets
Members
Members
Collapse sidebar
Close sidebar
Activity
Graph
Create a new issue
Jobs
Commits
Issue Boards
Open sidebar
wangjie
OpenXG-RAN
Commits
b33993f5
Commit
b33993f5
authored
Jun 23, 2020
by
Remi Hardy
Browse files
Options
Browse Files
Download
Email Patches
Plain Diff
Update TESTING_GNB_W_COTS_UE.md
parent
ec7d26d3
Changes
1
Hide whitespace changes
Inline
Side-by-side
Showing
1 changed file
with
13 additions
and
21 deletions
+13
-21
doc/TESTING_GNB_W_COTS_UE.md
doc/TESTING_GNB_W_COTS_UE.md
+13
-21
No files found.
doc/TESTING_GNB_W_COTS_UE.md
View file @
b33993f5
...
...
@@ -5,7 +5,7 @@
*
Commercial UE: Oppo Reno 5G
*
OAI Software Defined gNB and eNB
*
eNB RF front end: USRP (ETTUS) B200 Mini or B210
*
gNB RF front end: USRP (ETTUS) B200 Mini or B210 (N3
0
0 will be needed for MIMO and wider BW's)
*
gNB RF front end: USRP (ETTUS) B200 Mini or B210 (N3
1
0 will be needed for MIMO and wider BW's)
*
5G TDD duplexing mode
*
5G FR1 Band n78 (3.5 GHz)
*
BW: 40MHz
...
...
@@ -17,7 +17,7 @@ https://gitlab.eurecom.fr/oai/openairinterface5g/tree/develop
## Architecture Setup
photos and schemes
The scheme below depicts our typical setup:
![
image info
](
./testing_gnb_w_cots_ue_resources/oai_fr1_setup.jpg
)
...
...
@@ -32,32 +32,27 @@ See https://gitlab.eurecom.fr/oai/openairinterface5g/blob/develop/doc/BUILD.md#b
for reference:
https://github.com/OPENAIRINTERFACE/openair-epc-fed/blob/master-documentation/docs/DEPLOY_HOME.md
```
sudo bash
cd /opt/hss_sim0609
./starthss_real
sudo
```
-
**eNB**
```
sudo bash
cd /opt/hss_sim0609
./starthss_real
sudo
```
-
**gNB**
```
sudo bash
cd /opt/hss_sim0609
./starthss_real
sudo
```
## Conf Files
where are the
y
usage
where are the
config files located
how to use them
## Run / Test
...
...
@@ -65,9 +60,7 @@ usage
-
**EPC**
(on EPC host):
```
sudo bash
cd /opt/hss_sim0609
./starthss_real
sudo
```
Open another window and:
...
...
@@ -75,8 +68,7 @@ Open another window and:
```
sudo bash
cd /opt/ltebox/tools
./stop_ltebox
./start_ltebox
```
Note: when terminated the testing session, you shall stop the EPC by "./stop_ltebox"
...
...
@@ -99,15 +91,15 @@ Note: gNB is using branch NR_RRC_PRACH_procedures patched with gnb.diff
## Test Case
Test case description
Test case description
: UE attachement
## Expected Logs to check
what
and where to check
what
logs and where to check, to ensure that your setup works fine
## Required traces for debug
What info/traces/logs are needed for us to support the debug
## Status of the interoperability
-
setup of the CP in 4G
...
...
Write
Preview
Markdown
is supported
0%
Try again
or
attach a new file
Attach a file
Cancel
You are about to add
0
people
to the discussion. Proceed with caution.
Finish editing this message first!
Cancel
Please
register
or
sign in
to comment