• cig's avatar
    Introduced a delay after a completed sync before starting msg1 generation: · 0663c7bd
    cig authored
    - this was necessary because as soon as the gNB starts, it tries detecting
      the prach preambles and it mesaures the background noise. However, there is
      a delay of several dozens of frames before it considers the preables as
      detected.
    - the solution at the UE consists in avoiding sending preamble as soon as the
      UE syncs by introducing an offset, this keeps the power measurements low at
      gNB side as long as the preamble detection counter is under threshold
    0663c7bd
nr_estimation.h 3.79 KB