Commit f9a2829b authored by Remi Hardy's avatar Remi Hardy

Update TESTING_GNB_W_COTS_UE.md

parent c84e8a2b
DISCLAIMER : This page is under complete review and update, thanks for your patience
## Configuration Overview:
## Table of Contents ##
1. [Configuration Overview](#configuration-overview)
2. [SW Repository / Branch](#repository)
3. [Architecture Setup](#architecture-setup)
4. [Build / Install](#build-and-install)
5. [Run / Test](#run-and-test)
6. [Test case](#test-case)
7. [Log file monitoring](#log-file-monitoring)
6. [Required tools for debug](#required-tools-for-debug)
7. [Status of interoperability](#status-of-interoperability)
## Configuration Overview
* Non Standalone (NSA) configuration : initial Control Plane established between UE and RAN eNB, then User Plane established between UE and gNB, Core network is 4G based supporting rel 15
......@@ -13,7 +25,7 @@ DISCLAIMER : This page is under complete review and update, thanks for your pati
* BW: 40MHz
* Antenna scheme: SISO
## SW Repository / Branch
## Repository
https://gitlab.eurecom.fr/oai/openairinterface5g/tree/develop
......@@ -28,7 +40,7 @@ The photo depicts the FR1 setup part of the scheme above:
![image info](./testing_gnb_w_cots_ue_resources/oai_fr1_lab.jpg)
## Build / Install
## Build and Install
General guidelines for building :
See https://gitlab.eurecom.fr/oai/openairinterface5g/blob/develop/doc/BUILD.md#building-ues-enodeb-and-gnodeb-executables
......@@ -60,6 +72,8 @@ These config files are passed as arguments of the run command line, using the op
Some config examples can be found in the following folder:
https://gitlab.eurecom.fr/oai/openairinterface5g/-/tree/develop/targets/PROJECTS/GENERIC-LTE-EPC/CONF
TO DO : attach base confif files
These files have to be updated manually to set the IP addresses and frequency.
1- In the **eNB configuration file** :
......@@ -160,7 +174,7 @@ gNB config file :
```
## Run / Test
## Run and Test
The order to run the different components is important:
1- first, CN
......@@ -188,7 +202,7 @@ Execute:
```
for example:
For example:
```
~/openairinterface5g/cmake_targets/ran_build/build$ sudo ./lte-softmodem -O ../../../targets/PROJECTS/GENERIC-LTE-EPC/CONF/enb.band7.tm1.50PRB.usrpb210.conf | tee mylogfile.log
```
......@@ -204,7 +218,7 @@ Execute:
```
for example:
For example:
```
~/openairinterface5g/cmake_targets/ran_build/build$ sudo ./nr-softmodem -O ../../../targets/PROJECTS/GENERIC-LTE-EPC/CONF/gnb.band78.tm1.106PRB.usrpn300.conf | tee mylogfile.log
```
......@@ -212,17 +226,40 @@ for example:
## Test Case
Test case description : UE attachement
The test case corresponds to the UE attachement, that is the UE connection and its initial access in 5G, as depicted below:
**Source** : https://www.sharetechnote.com/html/5G/5G_LTE_Interworking.html
![image info](./testing_gnb_w_cots_ue_resources/attach_signaling_scheme.jpg)
The test reaches step **12. E-RAB modifcation confirmation** , eventhough not all the messages will appear in the log file.
## Log file monitoring
From the log file that is generated, we can monitor several important steps, to assess that the test was successful:
Step **6. Random Access Procedure** is successfully reached when the following messages are shown:
[X2AP ... Received elements for X2P]
...
[LSCH received ok]
The next message to check is:
[DCI type I payload] indicating some DL traffic for signaling
Eventually, step **12. E-RAB Modification Confirmation** is successfully reached when the following message is visible:
[E-RAB Modification Confirmation], the message is properly received but not treated.
## Expected Logs to check
TO DO : attach typical succcessful log file as example, add snaps of msg
what logs and where to check, to ensure that your setup works fine (or not ...)
## Required tools for debug
## Required traces for debug
- **Wireshark** to trace X2AP and S1AP protocols
- **Ttracer** for 5G messages
- **GDB debugger** to check function calls
What info/traces/logs are needed for us to support the debug
## Status of the interoperability
## Status of interoperability
The following parts have been validated with FR1 COTS UE:
......
Markdown is supported
0%
or
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!