## Configuration Overview: ## Table of Contents ##
1. [Configuration Overview](#configuration-overview)
2. [SW Repository / Branch](#repository)
3. [Architecture Setup](#architecture-setup)
4. [Build / Install](#build-and-install)
5. [Run / Test](#run-and-test)
6. [Test case](#test-case)
7. [Log file monitoring](#log-file-monitoring)
6. [Required tools for debug](#required-tools-for-debug)
7. [Status of interoperability](#status-of-interoperability)
## Configuration Overview
* Non Standalone (NSA) configuration : initial Control Plane established between UE and RAN eNB, then User Plane established between UE and gNB, Core network is 4G based supporting rel 15 * Non Standalone (NSA) configuration : initial Control Plane established between UE and RAN eNB, then User Plane established between UE and gNB, Core network is 4G based supporting rel 15
...@@ -13,7 +25,7 @@ DISCLAIMER : This page is under complete review and update, thanks for your pati ...@@ -13,7 +25,7 @@ DISCLAIMER : This page is under complete review and update, thanks for your pati
* BW: 40MHz * BW: 40MHz
* Antenna scheme: SISO * Antenna scheme: SISO
## SW Repository / Branch ## Repository
https://gitlab.eurecom.fr/oai/openairinterface5g/tree/develop https://gitlab.eurecom.fr/oai/openairinterface5g/tree/develop
...@@ -28,7 +40,7 @@ The photo depicts the FR1 setup part of the scheme above: ...@@ -28,7 +40,7 @@ The photo depicts the FR1 setup part of the scheme above:
![image info](./testing_gnb_w_cots_ue_resources/oai_fr1_lab.jpg) ![image info](./testing_gnb_w_cots_ue_resources/oai_fr1_lab.jpg)
## Build / Install ## Build and Install
General guidelines for building : General guidelines for building :
See https://gitlab.eurecom.fr/oai/openairinterface5g/blob/develop/doc/BUILD.md#building-ues-enodeb-and-gnodeb-executables See https://gitlab.eurecom.fr/oai/openairinterface5g/blob/develop/doc/BUILD.md#building-ues-enodeb-and-gnodeb-executables
...@@ -60,6 +72,8 @@ These config files are passed as arguments of the run command line, using the op ...@@ -60,6 +72,8 @@ These config files are passed as arguments of the run command line, using the op
Some config examples can be found in the following folder: Some config examples can be found in the following folder:
https://gitlab.eurecom.fr/oai/openairinterface5g/-/tree/develop/targets/PROJECTS/GENERIC-LTE-EPC/CONF https://gitlab.eurecom.fr/oai/openairinterface5g/-/tree/develop/targets/PROJECTS/GENERIC-LTE-EPC/CONF
TO DO : attach base confif files
These files have to be updated manually to set the IP addresses and frequency. These files have to be updated manually to set the IP addresses and frequency.
1- In the **eNB configuration file** : 1- In the **eNB configuration file** :
...@@ -160,7 +174,7 @@ gNB config file : ...@@ -160,7 +174,7 @@ gNB config file :
``` ```
## Run / Test ## Run and Test
The order to run the different components is important: The order to run the different components is important:
1- first, CN 1- first, CN
...@@ -188,7 +202,7 @@ Execute: ...@@ -188,7 +202,7 @@ Execute:
``` ```
for example: For example:
``` ```
~/openairinterface5g/cmake_targets/ran_build/build$ sudo ./lte-softmodem -O ../../../targets/PROJECTS/GENERIC-LTE-EPC/CONF/enb.band7.tm1.50PRB.usrpb210.conf | tee mylogfile.log ~/openairinterface5g/cmake_targets/ran_build/build$ sudo ./lte-softmodem -O ../../../targets/PROJECTS/GENERIC-LTE-EPC/CONF/enb.band7.tm1.50PRB.usrpb210.conf | tee mylogfile.log
``` ```
...@@ -204,7 +218,7 @@ Execute: ...@@ -204,7 +218,7 @@ Execute:
``` ```
for example: For example:
``` ```
~/openairinterface5g/cmake_targets/ran_build/build$ sudo ./nr-softmodem -O ../../../targets/PROJECTS/GENERIC-LTE-EPC/CONF/gnb.band78.tm1.106PRB.usrpn300.conf | tee mylogfile.log ~/openairinterface5g/cmake_targets/ran_build/build$ sudo ./nr-softmodem -O ../../../targets/PROJECTS/GENERIC-LTE-EPC/CONF/gnb.band78.tm1.106PRB.usrpn300.conf | tee mylogfile.log
``` ```
...@@ -212,17 +226,40 @@ for example: ...@@ -212,17 +226,40 @@ for example:
## Test Case ## Test Case
Test case description : UE attachement The test case corresponds to the UE attachement, that is the UE connection and its initial access in 5G, as depicted below:
**Source** : https://www.sharetechnote.com/html/5G/5G_LTE_Interworking.html
![image info](./testing_gnb_w_cots_ue_resources/attach_signaling_scheme.jpg)
The test reaches step **12. E-RAB modifcation confirmation** , eventhough not all the messages will appear in the log file.
## Log file monitoring
From the log file that is generated, we can monitor several important steps, to assess that the test was successful:
Step **6. Random Access Procedure** is successfully reached when the following messages are shown:
[X2AP ... Received elements for X2P]
...
[LSCH received ok]
The next message to check is:
[DCI type I payload] indicating some DL traffic for signaling
Eventually, step **12. E-RAB Modification Confirmation** is successfully reached when the following message is visible:
[E-RAB Modification Confirmation], the message is properly received but not treated.
## Expected Logs to check TO DO : attach typical succcessful log file as example, add snaps of msg
what logs and where to check, to ensure that your setup works fine (or not ...) ## Required tools for debug
## Required traces for debug - **Wireshark** to trace X2AP and S1AP protocols
- **Ttracer** for 5G messages
- **GDB debugger** to check function calls
What info/traces/logs are needed for us to support the debug
## Status of the interoperability ## Status of interoperability
The following parts have been validated with FR1 COTS UE: The following parts have been validated with FR1 COTS UE:
......