An error occurred fetching the project authors.
- 10 Jan, 2021 1 commit
-
-
Laurent authored
-
- 23 Dec, 2020 1 commit
-
-
Laurent authored
-
- 02 Dec, 2020 1 commit
-
-
rmagueta authored
-
- 01 Dec, 2020 1 commit
-
-
cig authored
- enabled procedures that were already called for phy-test mode - enabled setup of DRB for the current C-RNTI - enhanced information, debugging and warning logging at MAC/RLC/PDCP level
-
- 24 Nov, 2020 1 commit
-
-
yaojie authored
-
- 06 Nov, 2020 1 commit
-
-
yaojie authored
-
- 22 Sep, 2020 1 commit
-
-
Cedric Roux authored
This commit introduces several enhancements in X2AP and RRC to deal with ENDC. The main goal is to deal with UE's on/off and with various errors. The following work is included: - DC prep and DC overall X2 timers - X2 messages for UE release and DC timers' timeout Open problems: - what to do when the UE sends an scg Failure? This commit removes the UE. And this removal may not be correctly done - UE removal in the gNB's PHY layer (a next commit is coming, but it is hackish and will need a rework)
-
- 21 Sep, 2020 1 commit
-
-
zhenghuangkun authored
-
- 18 Aug, 2020 1 commit
-
-
Francesco Mani authored
-
- 06 Aug, 2020 1 commit
-
-
- 05 Aug, 2020 1 commit
-
-
Francesco Mani authored
-
- 09 Jul, 2020 1 commit
-
-
Cedric Roux authored
-
- 02 Jul, 2020 2 commits
- 25 Jun, 2020 1 commit
-
-
matzakos authored
-
- 09 Jun, 2020 6 commits
-
-
s.rampalli authored
-
s.rampalli authored
-
s.rampalli authored
-
s.rampalli authored
-
s.rampalli authored
-
laurent authored
-
- 04 Jun, 2020 1 commit
-
-
laurent authored
-
- 01 Jun, 2020 1 commit
-
-
- 29 May, 2020 1 commit
-
-
s.rampalli authored
-
- 20 May, 2020 1 commit
-
-
s.rampalli authored
-
- 19 May, 2020 1 commit
-
-
matzakos authored
-
- 14 May, 2020 2 commits
-
-
s.rampalli authored
-
s.rampalli authored
-
- 13 May, 2020 1 commit
-
-
- 12 May, 2020 1 commit
-
-
Raymond Knopp authored
-
- 04 May, 2020 1 commit
-
-
Raymond Knopp authored
-Upon reception of SgNB Addition Request from the eNB, the gNB configures pdcp and rlc entities for the list of DRBs provided from the eNB
-
- 20 Apr, 2020 1 commit
-
-
s.rampalli authored
-
- 04 Apr, 2020 1 commit
-
-
matzakos authored
Fix RFSIMULATOR issues (gNB side) after merge of NR_test_S1U_RRC_PRACH_procedures into NR_RRC_PRACH_procedures
-
- 20 Mar, 2020 1 commit
-
-
Raymond Knopp authored
-
- 13 Mar, 2020 1 commit
-
-
matzakos authored
-
- 12 Mar, 2020 2 commits
-
-
matzakos authored
-
Cedric Roux authored
-
- 11 Mar, 2020 1 commit
-
-
matzakos authored
ENDC path switch S1-U: Integrated S1AP E-RAB-Modification indication message at eNB, interfacing with RRC and X2AP to get proper configuration of E-RABs to be modified and GTP-U configuration at gNB
-
- 17 Feb, 2020 1 commit
-
-
Cedric Roux authored
-
- 12 Feb, 2020 1 commit
-
-
cig authored
-